Conduct at Issue

This case concerns the PJM Interconnection, L.L.C. (PJM) wholesale electric markets and, specifically, PJM’s market rules that allow certain generators to collect revenues associated with lost opportunity credits (LOCs). The PJM tariff provides for payment of LOCs to combustion turbines (CTs) and certain other generators that clear the day-ahead (DA) energy market, but are not dispatched in the real-time (RT) market. PJM established LOCs to encourage generators to keep their resources as part of PJM’s pool-scheduled resources and thereby allow PJM to control their output to manage system operations and maintain reliability. In essence, PJM’s grid management and dispatch decisions benefit from the flexibility afforded by having control over these generators—and the generator owners are willing to cede that control because of lost opportunity payments they could obtain when PJM decides not to run their plants.

The key issue in the investigation turned on when and how LOCs were paid out and whether GSEMNA engaged in a scheme to improperly take advantage of PJM’s LOC payment formulas to obtain LOC dollars it should not have obtained. As to the payment formula details, during the May 2011 to September 2013 time period at issue, PJM paid LOCs equal to the higher of (a) the difference between the RT locational marginal price and the DA locational marginal price, or (b) the difference between the RT locational marginal price and the higher of the unit’s price-based or cost-based incremental energy offers. The LOC formula did not subtract start-up and no-load costs, although such costs would be incurred if the unit were dispatched by PJM in the RT market. As a result, a generator with a DA award could earn a greater margin when it received LOCs and was not dispatched in the RT market than it would have earned if it was dispatched.

Beginning in or around June 2011, GSEMNA implemented a strategy to profit from LOCs by offering CT units in the DA market below the CT units’ calculated costs with the goal of clearing the DA market and then collecting LOCs if the units were not dispatched. GSEMNA discounted its DA price-based offers below calculated costs, knowing that the CT units likely would run at a loss if dispatched. In November 2011, after PJM corrected an error in which it was calculating LOCs based on price-based offers rather than the higher of the price-based or cost-based offers as required by its tariff, GSEMNA began discounting the cost-based offers for the units to the level of its price-based offers. As a result, the LOCs that GSEMNA received for the CT units would continue to be based on the discounted offer and would be higher than if they were based on estimated costs. GSEMNA continued to implement its strategy during the relevant period by discounting a given CT unit’s DA offer based on an assessment of the likelihood that the CT unit would not be dispatched in the RT market, weighing the risk of running the CT unit at a loss if dispatched against the potential reward of LOCs if not dispatched. At times, GSEMNA discounted offers for the CT units to get DA awards in order to obtain LOCs by offering the units with discounts as deep as -$25/MWh. When GSEMNA expected a CT unit to be dispatched in the RT market, it did not discount its DA offer, and GSEMNA typically did not discount offers for units that were not eligible for LOCs.

Enforcement’s Findings

Enforcement concluded that GSEMNA violated the Anti-Manipulation Rule by engaging in a strategy to target and inflate the receipt of LOCs in PJM. Enforcement found that GSEMNA’s strategy of targeting and inflating LOCs was “contrary to supply and demand fundamentals” and “impaired the functioning of the LOC provisions of the PJM market and PJM’s unit commitment process.”1 Enforcement found that GSEMNA’s offers “did not reflect the price at which it wanted to generate power, but rather the price at which it could obtain a DA award and then receive LOCs during periods when the discounted CT units likely could not be operated economically”—conduct Enforcement concluded was “contrary to LOCs’ purpose of compensating generators for lost opportunity costs due to PJM’s decision not to dispatch a generation unit.”2

Key Takeaways

  • Only the fourth “gaming” settlement. While FERC’s pursuit of electric market “gaming”3 cases has gained much attention in the industry, Enforcement has brought relatively few of these cases to date (whether through settlements or Orders to Show Cause and follow-on federal court litigation). This case is only the fourth such settlement. The other three were a $410 million settlement with JP Morgan Ventures Energy Corporation (JPMVEC) in 2013 for various bidding strategies in California (CAISO) and Midcontinent (MISO) markets, an approximately $81,000 settlement with Oceanside Power, LLC in 2013 for an up-to congestion product bidding strategy in PJM and an $8 million settlement with Maxim Power Corp. for certain bidding activities in ISO New England.4
  • Largest settlement in almost four years. In recent years, subjects in enforcement cases have increasingly elected to defend themselves in court rather than settle, particularly in cases involving large civil penalties. This case is by far the largest enforcement settlement in almost four years since JPMVEC’s $410 million settlement in 2013. On the other hand, there are several cases involving potential eight-or nine-figure penalties that are being contested at the Commission or in court. Notwithstanding this settlement, we think the recent trend of subjects electing to litigate rather than settle large cases will continue, at least until there are more federal court decisions providing clarity on the scope of FERC’s Anti-Manipulation Rule.
  • Lack of quorum could temporarily halt certain enforcement actions. FERC approved two enforcement settlements this week—the GSEMNA settlement and a $36,000 settlement with Covanta Haverhill Associates LP for allegedly violating ISO New England’s tariff. FERC almost certainly made an effort to approve these settlements (along with numerous orders in other, non-enforcement cases) this week because, beginning next week after Commissioner Norman Bay resigns, FERC will not have a quorum of commissioners needed to issue orders in many types of proceedings. While it is not clear how long FERC will be without a quorum (i.e., how long it will take for the President to nominate, and the Senate to confirm, at least one new commissioner), the lack of a quorum will likely preclude enforcement cases requiring formal Commission action from moving forward. While most investigation work does not require formal Commission action, Commission orders are required to, among other things, approve settlements and initiate and issue orders in formal agency enforcement actions (i.e., Order to Show Cause proceedings).

1 Settlement at P 16.

2 Id.

3 Enforcement staff frequently characterizes these types of cases as involving “gaming” of RTO market rules. The Enforcement defense bar and other industry participants and FERC watchers use the term as well. The Commission itself—which must approve settlement orders and enforcement actions—rarely uses the term “gaming.”  In any case, whether the term “gaming” is used or not to describe allegedly improper RTO bidding strategies, what matters is whether the conduct violates the specific terms of the Anti-Manipulation Rule.

4 In Re Make-Whole Payments and Related Bidding Strategies, 144 FERC ¶ 61,068 (2013); In re PJM Up-To Congestion Transactions, 142 FERC ¶ 61,088 (2013); Maxim Power Corp., 156 FERC ¶ 61,223 (2016).  There are also three related “gaming” cases—all of which involve up-to congestion transactions in PJM—that did not settle and are currently being litigated in federal district court.  In one of these cases, the court agreed with FERC’s legal theory that the gaming conduct at issue, if proved, would violate the Anti-Manipulation Rule.  FERC v. City Power Mktg., LLC, 2016 WL 4250233 (D.D.C. Aug. 10, 2016).  However, that was on a motion to dismiss, and neither that court nor any other court has yet ruled on the merits of a “gaming” case.

Share This Insight

Previous Entries

Speaking Energy

January 30, 2025

The oil & gas industry is experiencing a capital resurgence, driven by stabilizing interest rates and renewed attention from institutional investors. Private equity is leading the charge with private credit filling the void in traditional energy finance and hybrid capital instruments gaining in popularity. Family offices are also playing a crucial role, providing long-term, flexible investments.

...

Read More

Speaking Energy

January 23, 2025

Under a second Trump presidency, the U.S. is expected to consider reversal of many of the Biden administration’s climate and environmental policies, in addition to a markedly different approach to trade policy and oil & gas regulation. This includes expanding oil & gas development on public lands and offshore, lifting the pause on liquified natural gas (LNG) exports to non-Free Trade Agreement countries and repealing the methane fee.

...

Read More

Speaking Energy

January 15, 2025

We are pleased to share a recording of Akin’s recently presented webinar, “Drilling Down: What Oil & Gas Companies Can Expect from Federal Agencies During Trump’s Second Administration.”

...

Read More

Speaking Energy

January 9, 2025

On January 6, 2025, the Federal Energy Regulatory Commission (FERC) issued a Final Rule to amend its regulations governing the maximum civil monetary penalties assessable for violations of statutes, rules and orders within FERC’s jurisdiction. The Final Rule is a result of the Federal Civil Penalties Inflation Adjustment Act Improvements Act of 2015, which requires each federal agency to issue an annual inflation adjustment by January 15 for each civil monetary penalty provided by law within the agency’s jurisdiction. The adjustments in the Final Rule represent an increase of approximately 2.6% for each covered maximum penalty. FERC’s adjusted maximum penalty amounts, which will apply at the time of assessment of a civil penalty regardless of the date on which the violation occurred, are set forth here and will become effective upon publication in the Federal Register.

...

Read More

Speaking Energy

January 9, 2025

Join projects & energy transition partners Ike Emehelu and Shariff Barakat as well as climate change partner Ken Markowitz at Infocast's Projects & Money, where Ike will moderate the "The State of Project Finance – View from the C-Suite" panel, and Shariff will moderate the "Capital Markets & Other Capital Sources for Project Finance & Investment" panel. Ken will moderate the “Carbon Markets Forecast for 2025” panel.

...

Read More

Speaking Energy

January 8, 2025

On December 16, 2024, the Federal Energy Regulatory Commission (FERC or the Commission) issued an Order to Show Cause and Notice of Proposed Penalty proposing to assess staggering civil penalties against American Efficient, LLC and its affiliates (collectively, American Efficient) in connection with an alleged scheme to manipulate the capacity markets operated by PJM Interconnection, L.L.C. (PJM) and the Midcontinent Independent System Operator, Inc. (MISO).1 The Order directs American Efficient to show cause as to why it should not be required to pay a civil penalty of $722 million and disgorge $253 million.2

...

Read More

Speaking Energy

December 5, 2024

On November 27, 2024, the Federal Energy Regulatory Commission issued Venture Global CP2 LNG, LLC, an order that sets aside, in part, the Commission’s prior authorization of the CP2 LNG Terminal and CP Express Pipeline Project (collectively, the CP2 Project) under sections 3 and 7 of the Natural Gas Act (NGA). 

...

Read More

Speaking Energy

December 5, 2024

On November 27, 2024, in Venture Global, CP2 LNG, LLC,1 the Federal Energy Regulatory Commission’s (FERC or Commission) explicitly overruled precedent set in Northern Natural Gas Co.,2 a 2021 decision in which FERC made an affirmative finding that an interstate natural gas pipeline project it was certificating under section 7 of the Natural Gas Act (NGA) would not make a “significant” contribution to global climate change. Northern Natural is the only FERC decision in which a so-called significance determination was made with respect to greenhouse gas emissions (GHG) arising from a FERC-regulated natural gas infrastructure project. In Venture Global, FERC rejected arguments that it needed to follow Northern Natural and assess the significance of GHG emissions in all NGA certificate proceedings to comply with the National Environmental Policy Act (NEPA). NEPA requires federal agencies, including FERC, that perform “major federal actions,” which include issuing NGA section 7 certificates, to prepare an environmental impact statement (EIS) if the action will “significantly affect[] the quality of the human environment.”3 FERC has been under pressure to fully explain why it has chosen not to apply Northern Natural’s significance analysis in subsequent cases, and that issue is currently before FERC on remand from the U.S. Court of Appeals for the District of Columbia (D.C. Circuit) in Healthy Gulf et al. v. FERC, which reviewed FERC’s approval of a liquefied natural gas (LNG) terminal under NGA section 3.

...

Read More

© 2025 Akin Gump Strauss Hauer & Feld LLP. All rights reserved. Attorney advertising. This document is distributed for informational use only; it does not constitute legal advice and should not be used as such. Prior results do not guarantee a similar outcome. Akin is the practicing name of Akin Gump LLP, a New York limited liability partnership authorized and regulated by the Solicitors Regulation Authority under number 267321. A list of the partners is available for inspection at Eighth Floor, Ten Bishops Square, London E1 6EG. For more information about Akin Gump LLP, Akin Gump Strauss Hauer & Feld LLP and other associated entities under which the Akin Gump network operates worldwide, please see our Legal Notices page.